Application for Plumbing / Natural Gas Permit

The plumbing permit is valid for a maximum of twelve (12) months from the date of issue, after 12 months it becomes null and void. If work has not been completed, a second permit shall be required to be purchased at the fee which is then currently charged. This permit becomes null and void if work or construction authorized is not commenced within six (6) months OR if construction or work is suspended or abandoned for a period of six (6) months at any time after work is begun.

HOW TO SCHEDULE AN INSPECTION:

Contact City Hall (speak to Patrick Clarey) at 574-3108 and request inspection. If call is before noon, the inspection shall be done at 1:00 pm that day, normally. Any called in after that time shall be done the next day at 1:00 pm.